pi_circular Cargo riskOperational risk Gard
In the last six months Gard has been notified of five incidents of mooring line failures at the port of Veracruz. Our local correspondent, Pinedo Abogados, attributes these failures to the ongoing port expansion construction at the Northern terminal and bouts of increasingly severe weather, specifically cold fronts.
Veracruz Port: Mooring line failures due to port expansion and weather | Gard's Insights
Gard
Read full article at Gard →
Opens Gard in a new tab