news Offshore Offshore Energy
Prysmian has provided a solution to a tie-back project in the pre-salt layer off the coast of Brazil, which it describes as a groundbreaking system envisioned to connect fields 30 kilometers (km) away to a floating production, storage, and offloading (FPSO) unit, enabling fast-tracked development of an oil project with a reduction in costs and time spent on the project’s development.
Frade Wahoo PRIO PetroRio Campos Basin Prysmian Offshore Specialties Vila Velha Offshore Specialties National Petroleum Agency Natural Gas Brazil Exploration Brazilian Institute Renewable Natural Resources Italy VARD
Prysmian’s ‘first-of-its-kind’ FPSO subsea tie-back system in Brazil saves operator money and time for offshore oil project
Offshore Energy
Read full article at Offshore Energy →
Opens Offshore Energy in a new tab