news Offshore Offshore Energy
The seabed clearance phase for the second electrical interconnector between Malta and Italy has begun, aiming to make the cable corridor route debris-free and safe for cable installation. Following the completion of the detailed marine route survey carried out by Italy’s Next Geosolutions (NextGeo), the IC2 interconnector has advanced to the identification and clearance phase […]
Interconnect Malta Sicily HVAC Next Geosolutions Armed Forces of Malta Christian Spiteri Second Interconnector Offshore Energy Following NextGeo Italian Activities ROVs Manager Ensuring
Seabed clearance for second Malta-Italy interconnector to remove 393 targets
Offshore Energy
Read full article at Offshore Energy →
Opens Offshore Energy in a new tab