Maritime Reader

NEWS INTELLIGENCE ARCHIVE
03 AUG 2026 MONDAY
Advanced filters
Keywords | type to search… Date: All time Sources: All Topics: All
ADVISORIES ARE AVAILABLE AT http://www.pancanal.com FOR ETAS OR DIRECT COMMUNICATION WITH OUR OFFICES, REFER TO NOTICE N-3-2023 Panama Canal Authority Vice Presidency for Operations Advisory T o S hipping No. A-42-2023 September 25, 2023 TO: All Shipping Agents, Owners, and Operators SUBJECT: Modification to the Fresh Water Surcharge (variable component) Given the critical condition of freshwater availability in the Panama Canal watershed, the Panama Canal Authority (ACP) announces a modification to the variable component of the Fresh Water Surcharge effective October 1, 2023. This consists in changing the Gatun Lake level curve center from 82 feet to 79 feet, which is equivalent to a maximum draft of 44 feet (Tropical Fresh Water- TFW) for vessels transiting the Neopanamax locks, without affecting the maximum draft for vessels in the Panamax locks. This curve center of 79 feet and the maximum draft of 44 feet represent water saving efforts to ensure traffic sustainability in the coming months. The resulting percentage derived from the formula will vary from 0% to 10%, and will be applied to the total tolls of the vessel, including the fixed and variable portions of tolls in cases where the toll structure includes those components. The percentage applicable to each vessel will be directly related to the level of Gatun Lake. The percentage used for the variable component applicable to each vessel will be calculated daily, using the following formula: Where the x represents the level of Gatun Lake in feet, rounded to one decimal place, as registered at 1200 hours on the day prior to the vessel’s transit. This percentage will be applied to all vessels transiting the following day. Because the maximum draft of 44 feet is a reduction in cargo capacity compared to previous maximum allowable drafts at the Panama Canal, the 79 feet center in the formula translates into a lower charge in the variable component of the Fresh Water Surcharge (FWS), representing a financial relief for our customers during this critical period. The charges applicable to the fixed component of the FWS will remain the same until further notice. For your reference, the following graph illustrates the variable component percentage associated to each level of Gatun Lake, in feet: 3654-A (OP-I) V. 29/03/2023 3654-A (OP-I) V. 29/03/2023 OP, September 25, 2023 Subject: Modification to the Fresh Water Surcharge (variable component) Further inquiries on the subject matter shall be directed to customerservice@pancanal.com ORIGINAL SIGNED Boris Moreno Vásquez Vice President for Operations
← Back to latest
regulation Panama Canal Authority ·2023-09-25

May 4, 2007

Panama Canal Authority
Read full article at Panama Canal Authority →
Opens Panama Canal Authority in a new tab

Topics & segments

← Back to latest

Related Knowledge

Documents on the same topic from the archive